Full Menu

Site Studies

This page was created as a resource of available studies of different sites.  The resources on this page will be updated as additional information becomes available.


Division Wide – All APS | Abingdon | Alice W. Fleet | Arlington Science Focus | Ashlawn | ATS | Barcroft | Barrett | Campbell | Career Center | Carlin Springs | Discovery | Dorothy Hamm | Dr. Charles R. Drew | Education Center | Glebe | Gunston | Henry | Hoffman-Boston | Jamestown | Jefferson | Kenmore | Long Branch | McKinley | Nottingham | Oakridge | Planetarium | Randolph | Reed/Cardinal | Swanson | TaylorWilliamsburg | Multiple APS Sites

Lubber Run Community Center | Madison Community CenterQuincy Site 


Divisionwide

APS – 2021 – Compiled Site Data by Zone Spreadsheet

  • This is a working document that will be used to capture data on sites for APS.
  • Data points were identified by APS constituent groups.
  • When applicable information was available in existing site studies, it was captured in this file.
  • This file will be updated to include additional information as additional data becomes available. 

APS – 2019 – Design Studies per School Board CIP Direction ​

This includes cost estimates only for the following locations:

  • The Heights Building
  • Virginia Hospital Center Temporary Swing Space for Elementary School
  • Trades Center Expand Bus Parking
  • New Elementary School Location TBD

Potential Sites – 2019 – County Manager’s Letter to Superintendent ​

South Arlington Work Group (SAWG) – 2016

APS – 2014 – Divisionwide Utilization and Occupancy Study


Abingdon (2014, 2011)

Abingdon – 2014 – Site Plans

Abingdon – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Abingdon – 2011 – Programmatic Cost Estimate

Additional information is available in the Multiple Sites section below.


Arlington Science Focus  (2017, 2014)

Arlington Science Focus – 2017 – Feasibility Study

Arlington Science Focus – 2014 – Dirt Room Narrative

Arlington Science Focus – 2014 – Dirt Room Study


Ashlawn (2011, 2006)

Ashlawn – 2011 – Site Plans

Ashlawn – 2011 – Conceptual Design / Feasibility Cost Estimate Report

Ashlawn – 2006 – Building Information Report


Arlington Traditional (New Key Site) (2019, 2014, 2011)

APS – 2019 – Design Studies per School Board CIP Direction ​

Arlington Traditional – 2014 – Preliminary Scheme

Arlington Traditional – 2011 – Site Plans

Arlington Traditional – 2011 – Design Study

Arlington Traditional – 2011 – Conceptual Design/Feasibility Cost Estimate Report


Barcroft (2019, 2014, 2006)

APS – 2019 – Design Studies per School Board CIP Direction ​

Barcroft – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Barcroft – 2014 – Preliminary Scheme

Barcroft – 2006 – Building Information Report


Barrett (2006)

Barrett – 2006 – Building Information Report

Barrett – 2006 – Supporting Documentation


Campbell (2019, 2014)

APS – 2019 – Design Studies per School Board CIP Direction ​

Campbell – 2014 – Preliminary Scheme

Campbell – 2014 – Conceptual Design/Feasibility Cost Estimate Report


Career Center-Arlington Community-Montessori (Formerly Henry) (2016, 2014, 2013, 2011, 2008, 2007, 2006)

Career Center – 2016 – Geotechnical Engineering Report

Career Center – 2014 – Feasibility Cost Estimate Report

Career Center – 2014 – Feasibility Study – High School Update

Career Center – 2014 – Parking Options Study

Career Center – 2013 – Feasibility Study

Career Center/Arlington Mill – 2011 – Program/Utilization Study

Career Center – 2008 – Presentation (Based on 2007 Feasibility Study)

Career Center – 2008 – BLPC Presentation (Based on 2007 Feasibility Study)

Career Center – 2007 Feasibility Study

Montessori (Henry) – 2014 – Diagrams

Montessori (Henry) – 2006 – Building Information Report


Dorothy Hamm (Formerly HB Woodlawn) (2014, 2006)

Dorothy Hamm (HB Woodlawn) – 2014 – Site Diagrams

Dorothy Hamm (HB Woodlawn) – 2014 – Option 2 Diagrams

Dorothy Hamm (HB Woodlawn) – 2014 – Option 3 Diagrams

Dorothy Hamm (HB Woodlawn) – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Dorothy Hamm (HB Woodlawn) – 2006 – Building Information Report


Dr. Charles R. Drew (2014, 2011)

Dr, Charles R. Drew – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Dr.Charles R. Drew – 2011 – Option 1 & Option 2 Schemes

Dr. Charles R. Drew – 2011 – Option 2 Scheme

Dr. Charles R. Drew – 2011 – Conceptual Design/Feasibility Cost Estimate Report (Option 1)

Dr. Charles R. Drew – 2011 – Conceptual Design/Feasibility Cost Estimate Report (Option 2)

Additional information is available in the Multiple Sites section below.


Education Center (2014, 2011, 2006)

Education Center – 2014 – Feasibility Study

Education Center – 2011 – Feasibility Study

Education Center (Planetarium) – 2006 – Building Information Report


Glebe (2011)

Glebe – 2011 – Site Plans

Glebe – 2011 – Estimate of Probable Cost

Additional information is available in the Multiple Sites section below.


Gunston (2019, 2014, 2016)

Gunston – 2016 – Capacity Study

APS – 2014 – Divisionwide Utilization and Occupancy Study

Gunston – 2014 – Site Diagrams

Gunston – 2014 – Conceptual Design/Feasibility Cost Estimate Report


 

Hoffman-Boston (2011)

Hoffman-Boston – 2011 – Illustrative Site Plan

Hoffman-Boston – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Additional information is available in the Multiple Sites section below.


Jamestown (2011)

Jamestown – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Jamestown – 2011 – Site Diagrams


Jefferson-Alice W. Fleet (2014, 2013, 2012, 2011)

Fleet (Jefferson) – 2014 – Concepts A, B, C, and D (New School)

Fleet (Jefferson) – 2013 – Site Plans (New School)

Fleet (Jefferson) – 2011 – Diagrams (New School)

Fleet (Jefferson) – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Jefferson – 2012 – Parking Concept #1 Design

Jefferson – 2011 – Illustrative Plan

Jefferson – 2011 – Conceptual Design/Feasibility Cost Estimate Report 


Kenmore-Carlin Springs (2019, 2016, 2014, 2012, 2011)

APS – 2019 – Design Studies per School Board CIP Direction ​

Kenmore – 2016 – Capacity Study

Kenmore-Carlin Springs – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Kenmore-Carlin Springs – 2012 – Transportation Assessment (Draft)

Kenmore-Carlin Springs – 2011 – Scheme A & Scheme B

Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme A-Carlin Springs)

Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme A-Kenmore)

Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme B)


Long Branch (2017, 2006)

Long Branch – 2017 – Task #3

Long Branch – 2006 – Building Information Report


 McKinley (Future Arlington Traditional) (2011, 2006)

McKinley – 2011 – Cost Estimate

McKinley – 2006 – Building Information


 Nottingham (2011)

Nottingham – 2011 – Site Plan

Nottingham – 2011 – Cost Estimate

Additional information is available in the Multiple Sites section below.


Oakridge (2014, 2011)

Oakridge – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Oakridge – 2011 – Site Plan

Oakridge – 2011 – Site Plan (Lower Level)

Oakridge – 2011 – Conceptual Design/Feasibility Cost Estimate Report


 Randolph (2019, 2014, 2006)

APS – 2019 – Design Studies per School Board CIP Direction ​

Randolph – 2014 – Site Plan

Randolph – 2006 – Building Information Report


 Reed (Future Cardinal) (2014, 2012, 2011, 2006)

Reed – 2014 – Site Analysis

Reed – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Reed – 2012 – Site Plan

Reed – 2012 – Site Plan (First Floor)

Reed – 2012 – Conceptual Design/Feasibility Cost Estimate Report

Reed – 2011 – Site Plans

Reed – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Reed – 2006 – Site Information Report

Additional information is available in the Multiple Sites section below.


Swanson (2014)

Swanson – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Swanson – 2014 – Site Diagrams


 Taylor (2011)

Taylor – 2011- Conceptual Design/Feasibility Cost Estimate Report

Taylor – 2011 – Site Diagrams


Williamsburg-Discovery (2015, 2014, 2012, 2011, 2006)

Williamsburg – 2015 – Capacity and Expansion Studies

Williamsburg – 2014 – Diagrams

Williamsburg – 2014 – Ground Floor Diagrams

Williamsburg – 2014 – Conceptual Design/Feasibility Cost Estimate Report

Williamsburg-Discovery – 2012 – Transportation Assessment (Draft)

Williamsburg – 2011- Diagrams

Williamsburg – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Williamsburg (Discovery) – 2011 – New Elementary School Diagrams

Williamsburg (Discovery) – 2011 – Conceptual Design/Feasibility Cost Estimate Report

Williamsburg – 2006 – Building Information Report


Multiple APS Sites

Madison-Reed – 2012 – Site Plans

Madison-Reed – 2012 – Building Information

Abingdon-Glebe-Nottingham – 2011 – Feasibility Study

Abingdon-Glebe-Nottingham – 2011 Cost Estimate Report

Abingdon-Glebe-Nottingham – 2011 – Cost Estimate

Drew-Hoffman Boston – 2011 – Feasibility Study


Lubber Run Community Center (2014, 2012, 2008)

Lubber Run – 2012 – Scheme A and Scheme B Diagrams

Lubber Run – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Scheme A, Option 1)

  • Note that the cover page of the report above says “Kenmore Middle School” but that the information in the report is for Lubber Run as indicated on later pages.

Lubber Run – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Scheme B, Option 1)

Lubber Run – 2008 – Facility Condition Assessment


Madison Community Center (2012, 2010) 

Madison – 2012 – Option 1A, 1B, & 2 Diagrams

Madison – 2012 – Option 3 Diagrams

Madison – 2012 – Option 1A, 1B, & 2 Square Feet

Madison – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Option 1A, 1B, 2, & 3)

Madison – 2010 – Feasibility Study

Additional information is available in the Multiple Sites section below.


 Quincy (Buck) Site

APS – 2019 – Design Studies per School Board CIP Direction ​

Quincy (Buck) – 2018 – Diagrams

Quincy (Buck) – 2018 – Project Comparative Construction Budget Cost Summary

Quincy (Buck) – 2018 – Buck Swing Space Renovation to High School Program